April 2009 Incidents

 


B SHIFT 4-11-2009
Engine 4 delivered the Easter Bunny to the kids of 4th ward, then participated in some potato sack races and tug of war with the kids.

B SHIFT 4-11-2009
Engine 4 responded to a house fire on Barringer Dr. The incident was upgraded to a working fire from the start due to multiple calls. Engine 2 arrived and confirmed a working fire. Engine 4 assigned to check the attic. The fire was confined to one room. Companies on the box were: Batt. 3, 6, Engine 10, 2, 5, 4, Ladder 2, & Rescue 10.

14

B SHIFT 4-9-2009
Engine 4 & Ladder 4 were dispatched to a fire in a building under construction in the 200 blk. Of N. College St. Engine 4 & Ladder 4 arrived and were flagged down on the 5th St. side of the building and were advised that it was a rubbish fire below grade. Engine 1 arrived on the Trade St. side. The access point was on the 5th St. side. Engine 4 & Ladder 4 went to investigate while Engine 1 secured a hydrant and pulled a 1-¾ “ handline for fire attack. Engine 4’s Engineer hooked into the standpipe system. Batt. 1 arrived and struck a 2nd Alarm because of the below grade fire. The fire was quickly controlled with 1 handline.1st Alarm: Batt. 1, 3, Engine 4, 1, 5, 8, Ladder 4, 2, Rescue 3
2nd Alarm: Batt. 4, 6, Engine 64, 11, 10, 7, 6, Ladder 1, 18, Car 2, 14, 22, 802

B SHIFT 4-6-2009
Engine 4 & Ladder 4 responded to a trailer on fire loaded with pallets on Atando Ave. Engine 11 arrived and confirmed a working fire. Engine 4 assisted with suppression and Ladder 4 cut holes in the trailer for ventilation. The pallets had to be removed from the trailer to complete suppression. Companies that responded were: Batt. 1, Engine 11, 7, 4, 18, Ladder 18 & Rescue 10.

1-(1)1-(18)


 


Website designed & maintained by Fire Web Designs
Copyright©2007 by firestation4.com
Disclaimer & Terms of Use